Los Lucillos Municipal Summer Pool – Toledo
In 2023, the Los Lucillos town council in Toledo opted for salt chlorination to modernize and optimize the water treatment of its municipal summer pool.
Installation Needs
Despite having used hypochlorite in the past, improvements to the facilities and the desire to provide a healthier environment for users were key factors in choosing salt chlorination as the disinfection system for their summer pool.
Innowater equipment used
The Los Lucillos town council chose to install an Innowater industrial salt chlorinator, model SMC1000, ideal for its high capacity and compact design.
Additionally, a Monitor controller was added to optimize the management of different pool water parameters such as pH and chlorine.
Guaranteed Results
This installation demonstrates how the correct choice and configuration of Innowater equipr permite alcanzar un equilibrio perfecto entre rendimiento, automatización y confort. El resultado es una piscina con agua siempre equilibrada, transparente y segura, optimizando recursos y reduciendo el mantenimiento manual.
Details
-
Location
Los Lucillos (Toledo) -
Pool type
Municipal Summer Pool -
Dimensions
25 x 12,5 m -
Water volume
Over 500 m3





